masthead
News Listing

Upcoming Road Paving Projects: Harris Rd, Prairie Valley Rd & Switchback Rd

Jul 03, 2026
Upcoming Road Paving Projects: Harris Rd, Prairie Valley Rd & Switchback Rd

The District of Summerland would like to advise residents that paving and road reconstruction work will be taking place starting July 6 on two key roadways.

𝐇𝐚𝐫𝐫𝐢𝐬 𝐑𝐝 between Newton Rd and Hespeler Rd will be paved from 𝐉𝐮𝐥𝐲 𝟔–𝟏𝟎, 𝟐𝟎𝟐𝟔, between 7:00 am and 5:00 pm. During construction hours, the road will be closed to through traffic, with a detour in place. Local resident access will be maintained.

𝐏𝐫𝐚𝐢𝐫𝐢𝐞 𝐕𝐚𝐥𝐥𝐞𝐲 𝐑𝐝 between Morrow Ave and Doherty Ave will see road reconstruction and paving from 𝐉𝐮𝐥𝐲 𝟔–𝟐𝟒, 𝟐𝟎𝟐𝟔, between 7:00 am and 5:00 pm. The road will remain open during construction, with single-lane alternating traffic in effect.Please note: paving work on 𝐒𝐰𝐢𝐭𝐜𝐡𝐛𝐚𝐜𝐤 𝐑𝐨𝐚𝐝 is coming up in a couple of weeks. More details to follow.

We thank residents for their patience and cooperation as we work to improve road safety and infrastructure across the community.

As always, please slow down when approaching construction zones and watch for workers on site. Your caution helps keep everyone safe.

4 comments

Leave a comment
  1. eqei | Aug 12, 2026
    카드깡 신청 전 개개인의 신용한도 활용 가능액을 분석해 실질 요율을 대폭 낮춰 주는 든든한 매니저입니다
  2. apfox | Aug 06, 2026
    강남 가라오케은 정직하고 세련된 정찰제 결제 제도를 정직하게 명시하여, 야간에 흔히 발생하기 쉬운 과다 요금 요구나 투명하지 못한 세부 수수료 청구에 대한 단골 고객분들의 우려 사항들을 완벽히 해소해 주는 강남 지역 양심 매장으로 통하며, 품위 있는 접대 예절을 성실히 이행하는 담당 부장들이 책임감 있게 1:1 고객 마크제를 실시해 높은 명성을 얻었습니다.
  3. niit | Aug 02, 2026
    뛰어난 가독성과 부드러운 스크롤링을 보장하는 마루마루을 활용해 나만의 한가로운 웹툰 정주행 타임을 즐겨보시기 바랍니다.
  4. abfl | Jul 17, 2026
    럭셔리한 대리석 타일과 골드 포인트 가구들로 마감된 멋진 공간에서 감성 가득한 인생 사진을 건질 수 있는 강남 보스턴입니다.

    Leave a comment